Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 欧美国产日韩在线观看中文字幕 | 艳色歌舞5一区二区高清在线观看 | EEUSS影院www免费夜场 | 乱码丰满人妻一二三区痴汉电车 | 国产午夜精品一区二区三区四区 | 91麻豆秘秘 密入口蜜柚 | 日韩mv欧美mv第一 | 真人无遮挡毛片免费视频 | 国产一区二区AV漫画网站 | 国产成人无码aa精品国产91 | 免费黄色视频网站免费在线观看 | 国产裸体无遮挡免费精品视频 | 一级亚洲看片鲁在线观看 | 青青草原在线视频免费观看 | 懂色av蜜臀av粉嫩av分享 | 国产又黄又爽的免费视频 | 老外添女人囗交做爰视频 | 国产熟妇自偷自产二区 | 欧美特黄色一级视频大片 | 在线高清成人网站 | 久久老熟女一区蜜臀AⅤ中文字幕 | 蜜臀国产AV天堂久久无码蜜臀 | 亚洲一区二区在线老片 | 午夜激情视频在线观看 | 又粗又猛又爽又黄白丝久久 | 日本久久久久一级毛片 | 黄色免费观看视频无无法访问流畅观看视频 | 国产91玩精品秘 入口福利姬 | 波多野结衣无码电影 | 97人人添人人澡人人爽亚洲正品 | ThePorn国产熟女 | 国产乱一区二区三区夜爽 | 国产精品96久久久久久 | 被强行糟蹋的女人A片一区二区 | 七十路の高齢熟妇无码 | 日日摸人人爽av熟女 | 91极品美女裸身网站直播 | 小向美奈子乳巨码在线播放 | 91无码a人妻精一区二区三区 | 出租屋里嫖妓在线播放 |